I applied for a building permit on October 14th. Maplewood wants a second opinion. Looks like foundation is still sound... let the building permit roll! This exercise has taught me that a $250 engineer and a $1500 engineer are created equal.
RE: Martin Residence Foundation Inspection (FEG# 11.672)
Dear Mr. Killeen;
Pursuant to your request, Frontenac Engineering Group, Inc. has recently carried out a site visit
on Friday, October 14th, 2011 to the property located at 7127 High Street in Maplewood,
Missouri. The purpose of our visit was to visually inspect the foundations in the aftermath of the
fire. Please note that, since our inspection was visual in nature, we did not enter any areas that
are not normally accessible, nor was any destructive or non-destructive testing conducted. Thus,
we cannot warrant the future behavior of the building’s structure. Also, our inspection did not
include non-structural items, e.g. plumbing, electrical, HVAC.
We believe that the existing foundation is capable of supporting the new proposed house.
Hence, based on our visual inspections, we recommend the following:
• Rebuilding the North-East wall corner due to settlement.
• Rebuilding the South-West wall corner due to construction demolition damage.
• Grout solid all collar joints between the stone walls.
• Provide dowel bars between the stone walls and the new proposed block above.
Please feel free to contact me if you have any questions or comments.
Thank you,
Mohamed T. AL HARASH
Mohamed T. AL HARASH, Sc.D., P.E., S.E.
Chief Structural Engineer
Thursday, October 20, 2011
Wednesday, October 5, 2011
El Virgin
![]() | |||
| Reflection of the Virgin. The mural of the Virgin of Guadalupe is located next to a gas station in the Lower Valley of El Paso. (Cynthia Carol Almodovar/Borderzine.com) |
I was intimidated of the huge white wall in the kitchen, but as it turns out this will be a great home for the Virgin de Guadalupe mural like the one pictured above. You know, the one who crushes the serpent.
I recommend anyone to start building their dream home as soon as they can.
Wednesday, September 28, 2011
sewer lateral is clear
Sutter plumbing came out and videoed the exterior and interior sewer lines. The main clay sewer lateral is completely clear and uncracked, and not a candidate for the Sewer lateral Program. He said it looks good and could use a cleaning once the house is built.
The interior sewer line was also pointed out. This is made of cast Iron and he recommended replacing that with PVC, even though there were no cracks there either. He did not think the lines needed to be larger either; they are 4".
He gave me a rough estimate of $8200 for 41 feet of replacement line around $200 per foot installed.
The interior sewer line was also pointed out. This is made of cast Iron and he recommended replacing that with PVC, even though there were no cracks there either. He did not think the lines needed to be larger either; they are 4".
He gave me a rough estimate of $8200 for 41 feet of replacement line around $200 per foot installed.
Wednesday, September 7, 2011
Don't Tell Apollo.....
Demo work is complete and I meet T. Postal at the house to double check foundation appraisal, I bring Apollo with me for his morning jaunt. He is confused, very confused at the familiar surrounding but remembers how good it feels to sprint into the bamboo....
Claire, thanks for inviting me back over here. Sure looks different without the house
Ya Ted it does, so do you still think we can build on this? How does the foundation look... pulling the I-beams caused a little tear....
Aw, I think its beautiful. absolutely gorgeous. I think this might be the strongest foundation Ive ever seen....they dont make 'em like this.
Claire, thanks for inviting me back over here. Sure looks different without the house
Ya Ted it does, so do you still think we can build on this? How does the foundation look... pulling the I-beams caused a little tear....
Aw, I think its beautiful. absolutely gorgeous. I think this might be the strongest foundation Ive ever seen....they dont make 'em like this.
| Dont tell Apollo we are not staying here tonight..... |
| Double walled foundation: Limestone and 8 " Block |
| This is what a $30,000 coupon looks like |
Tuesday, August 23, 2011
Demolition permit approved
Thank you City of Maplewood for the demo permit. With the help of Public Works director, and Alderman of Ward 2 we made some movement with our new favorite building inspector.
Tuesday, August 16, 2011
building inspector resigns....shit
Dear Russ Todd,
Please come back to my building project. We were such tight buddies.I knew Diet Dr. Pepper was your favorite drink. I know you resigned the day my house was approved; but this new guy cannot fill your shoes! You are so smart, super chill, and years of building experience. I couldn't even ask for a building inspector who also happens to be a fire chief! I will find you. The guy who has your position know not only does not return phone calls; but he also refused to come out of his office. I think the secretary said he has never been a building inspector before. Im screwed Russ Todd... come back.
Please come back to my building project. We were such tight buddies.I knew Diet Dr. Pepper was your favorite drink. I know you resigned the day my house was approved; but this new guy cannot fill your shoes! You are so smart, super chill, and years of building experience. I couldn't even ask for a building inspector who also happens to be a fire chief! I will find you. The guy who has your position know not only does not return phone calls; but he also refused to come out of his office. I think the secretary said he has never been a building inspector before. Im screwed Russ Todd... come back.
Thursday, August 11, 2011
Motion to approve the design, say aye.
6:28 pm Thursday, August 11th, 2011
Index of Characters includes CM- me, MK the architect, and DR the design and review board members.
DR- Now calling High Street, tell us about your design.
(we step up to the table in the courtroom as the architect drawings are displayed on a huge projector screen)
CM- we are proposing a 1.5 story craftsman style home, this would replace the farmhouse design originally from the early 1900's
DR- This was the house that burnt up.
CM- Yes. yes it is.
DR- So, tell us about the materials
CM- Due to your ordinace on new home construction, brick is the major exterior material fused with the existing limestone, wood accents..... a blend.
MK- cement fiberboard, low VOC materials, eco insulation.. potential geo-thermal HVAC......
DR- Well it looks really nice, I drove by there today to see the lot and looks like you presented some pretty good details here. I like how the brick wraps around the house, sometimes you see veneer on one side and it does not look as nice here.
MK- the portico pitched roof and half ceiling would be the roof accents
CM- Just out of curiosity, why do you have a rule on brick? How can I answer this better when people keep asking me? The house was a farmhouse....
DR- Uh, well, I dont know really. we would have to ask the inspector but he is not here.
CM- because it is a considerable cost as Im putting construction schedule and budget together.
MK- I mean, is it debatable?
DM1- We might be able to meet again on this topic. Bring everyone together?
DM2 (as he finds the rule on brick in his book... ) ya looks like they want you to match it to the houses around you, like that carriage house next to yours.
DR1- well thanks for putting this organization together...Motion to approve the house on High Street, say Aye
DR2 - Aye
DR1- Aye
DR3- Aye
CM- AYE! (at the end pretty loud... accidentally in an excited 4- year- old- little girl sorta way)
Room starts laughing, big stamping and punching authorization noises proceeds, MK and I exit the building at 6:32 pm. 4 minutes of pure awesomeness.
Index of Characters includes CM- me, MK the architect, and DR the design and review board members.
DR- Now calling High Street, tell us about your design.
(we step up to the table in the courtroom as the architect drawings are displayed on a huge projector screen)
CM- we are proposing a 1.5 story craftsman style home, this would replace the farmhouse design originally from the early 1900's
DR- This was the house that burnt up.
CM- Yes. yes it is.
DR- So, tell us about the materials
CM- Due to your ordinace on new home construction, brick is the major exterior material fused with the existing limestone, wood accents..... a blend.
MK- cement fiberboard, low VOC materials, eco insulation.. potential geo-thermal HVAC......
DR- Well it looks really nice, I drove by there today to see the lot and looks like you presented some pretty good details here. I like how the brick wraps around the house, sometimes you see veneer on one side and it does not look as nice here.
MK- the portico pitched roof and half ceiling would be the roof accents
CM- Just out of curiosity, why do you have a rule on brick? How can I answer this better when people keep asking me? The house was a farmhouse....
DR- Uh, well, I dont know really. we would have to ask the inspector but he is not here.
CM- because it is a considerable cost as Im putting construction schedule and budget together.
MK- I mean, is it debatable?
DM1- We might be able to meet again on this topic. Bring everyone together?
DM2 (as he finds the rule on brick in his book... ) ya looks like they want you to match it to the houses around you, like that carriage house next to yours.
DR1- well thanks for putting this organization together...Motion to approve the house on High Street, say Aye
DR2 - Aye
DR1- Aye
DR3- Aye
CM- AYE! (at the end pretty loud... accidentally in an excited 4- year- old- little girl sorta way)
Room starts laughing, big stamping and punching authorization noises proceeds, MK and I exit the building at 6:32 pm. 4 minutes of pure awesomeness.
Subscribe to:
Posts (Atom)
